General wiring standards

To achieve reliable operation of the UCC S5 and the CMM's host computer, the following points should be observed:

  • All signal cables MUST be screened and all cable screens must be connected electrically to the metal shells of the cable connectors
  • It is recommended that cable screens should only be connected to the ground (via the connector shell) of the UCC S5 and SPA3
  • To avoid earth loops, cable screens should not be directly attached to the CMM's protective earth
  • The grounding must be continuous between the controller and all other equipment in the installation
  • All cable connectors should be secured to the UCC S5 and SPA3 by the connector jack screws

NOTE: The UCC S5 and SPA3 electronic zero volt rails are connected to their respective ground planes at star points within the UCC S5, the SPA3 and also to the protective ground of the ac supply.