PH10 Installation safetyElectrical requirementsThe PHC10-2 is powered from the a.c. mains supply via an IEC 320 connector. The operating voltages of the unit are as follows: 100 - 240 V ac +10%, -15% 47 - 66 Hz 30 W maximum Fuse replacementThere are two 2 Amp (T) HBC slow-blow fuses which are used for all voltages (one is a spare). Fuses are replaced as follows:
This equipment must be connected to a protective earth conductor via a three core mains (line) cable. The mains plug shall be inserted only into a socket outlet provided with a protective earth contact. The protective earth contact shall not be negated by the use of an extension cable without protective conductor. WARNING: Any interruption of the protective conductor may make the equipment dangerous. Make sure that the grounding requirements are strictly observed. Environmental conditionsThe following environmental conditions comply with those defined in BS EN61010 - 1:2001:
|