Testing and verification

The machine manufacturer or the installer of the UCC S5 is responsible for ensuring that the following testing and verification is performed to the appropriate standard:

  • Verification that the electrical equipment is in compliance with the technical documentation
  • Continuity testing of the protective bonding circuit
  • Insulation resistance tests
  • Functional tests, particularly those related to safety and safeguarding

System performance

Advisory

It is recommended that periodical metrology tests are performed in order to identify any faults in subsystems e.g. air bearings, structure, cables, software etc.